Outer Harbor

Outer Harbor, South Australia.

2024, Completed.

Utilizing our existing landholding in the premier Outer Harbor precinct, Forde Projects undertook the end-to-end development of a bespoke logistics facility for PrixCar. This project represents the strategic activation of a key industrial site, designed from the ground up to meet the sophisticated operational requirements of a national industry leader.

As both the landowner and developer, we maintained control over the design and delivery process, ensuring the facility met rigorous technical specifications. The project was engineered for high-volume flow and long-term durability, featuring heavy-duty hardstands and optimized structural layouts. Our hands-on approach ensured a seamless transition from greenfield site to a premium, high-performance industrial asset.

This development highlights our strength as a long-term partner in the built environment. Following our successful delivery of the purpose-built infrastructure, PrixCar has entered into a long-term lease agreement, securing the site’s future as a critical piece of South Australian logistics infrastructure.

Site update 01

Site update 02